[root]/src/edu/mit/icelab/games/cmsproject/engine

| Author | Changes | Lines of Code | Lines per Change |
|---|---|---|---|
| culim | 36 (100.0%) | 831 (100.0%) | 23.0 |
* Player modeling wip.
4 lines of code changed in 1 file:
* Renamed xml file for user testing.
* Added id to codas.
* Added user testing and player modeling to asset loader.
12 lines of code changed in 1 file:
* Added wallpaper bgm for prototype17b.
4 lines of code changed in 2 files:
* Activated bgm.
0 lines of code changed in 1 file:
* Added build versioning.
5 lines of code changed in 1 file:
* Added sound handling logic.
232 lines of code changed in 4 files:
* Renamed project to Mimesis.
6 lines of code changed in 3 files:
* Setting coda to globally stored variable.
1 lines of code changed in 1 file:
* Codas parser completed.
19 lines of code changed in 1 file:
* Made AnimatedOctopus accept a variable frame-rate for animations. (Defaulted to 2 frames/sec now.)
12 lines of code changed in 1 file:
* Added seahorse encounter.
5 lines of code changed in 1 file:
* Refactoring encounters narrative structure.
* Re-aligned NPC assets for Anglerfish.
* Narrative dialog switching WIP.
5 lines of code changed in 1 file:
* Added 'id' attribute to make searching easier.
* Reduces race condition by which loaded resources might return out-of-sync.
1 lines of code changed in 1 file:
* Implemented batch assets loading (sequential) for XML files.
34 lines of code changed in 1 file:
* Added XML parser for new encounters xml file.
5 lines of code changed in 1 file:
Facebook connection
32 lines of code changed in 1 file:
query bridge complete.
0 lines of code changed in 1 file:
Squiad Ink animated Objects
52 lines of code changed in 3 files:
updates
1 lines of code changed in 1 file:
integrated new npcs
3 lines of code changed in 1 file:
scnario entered.
12 lines of code changed in 2 files:
source code updates.
6 lines of code changed in 2 files:
Adding cms project into the repository
380 lines of code changed in 4 files: