[root]/src/edu/mit/icelab/games/cmsproject/music

| Author | Changes | Lines of Code | Lines per Change |
|---|---|---|---|
| culim | 17 (100.0%) | 465 (100.0%) | 27.3 |
* Added mimicry swapping heads.
8 lines of code changed in 1 file:
caught edge cases
33 lines of code changed in 1 file:
facebook integration complete.
97 lines of code changed in 1 file:
fixed permissions issues.
10 lines of code changed in 2 files:
facebook music connect image loader.
5 lines of code changed in 2 files:
Facebook connection
32 lines of code changed in 2 files:
query bridge complete.
66 lines of code changed in 3 files:
queued music query
96 lines of code changed in 1 file:
facebook connect
3 lines of code changed in 1 file:
adding genre integration to octopus
9 lines of code changed in 1 file:
added posing.
2 lines of code changed in 1 file:
Adding cms project into the repository
104 lines of code changed in 1 file: