[root]/src/edu/mit/icelab/games/cmsproject/screens

| Author | Changes | Lines of Code | Lines per Change |
|---|---|---|---|
| culim | 90 (100.0%) | 2485 (100.0%) | 27.6 |
* Carry emotion forward from customization screen.
3 lines of code changed in 1 file:
* With no user input, the octopus starts each encounter in a difference state. The current state should carry over from the previous encounter.
12 lines of code changed in 1 file:
* Increased delay from 2secs to 2.5secs.
5 lines of code changed in 1 file:
* Added wallpaper bgm for prototype17b.
4 lines of code changed in 1 file:
* Added mimicry swapping heads.
31 lines of code changed in 3 files:
* Activated bgm.
20 lines of code changed in 1 file:
* Added build versioning.
15 lines of code changed in 1 file:
* Added sound handling logic.
2 lines of code changed in 1 file:
* Added listener to replay button.
8 lines of code changed in 1 file:
* Added replay button at end.
10 lines of code changed in 1 file:
* Renamed project to Mimesis.
21 lines of code changed in 10 files:
* Integrated codas with personality selection picked from game.
* Added title screen.
* Added debug key.
103 lines of code changed in 3 files:
* Codas added and integrated.
127 lines of code changed in 2 files:
* Made AnimatedOctopus accept a variable frame-rate for animations. (Defaulted to 2 frames/sec now.)
1 lines of code changed in 1 file:
* Added new animated octopus and hooked in animations.
8 lines of code changed in 1 file:
* Added toggle for instructions.
4 lines of code changed in 1 file:
* Added "CloseUpOverlay" as standalone class to handle all internal state logic.
7 lines of code changed in 1 file:
* Added close-up internal response layer.
6 lines of code changed in 1 file:
* Added new version of instructions for gestures.
1 lines of code changed in 1 file:
* Debug control flow to launch new encounters.
3 lines of code changed in 1 file:
* Added new encounters logic to be based on xml structure. (WIP)
* Added 'Anglerfish' encounter. (WIP)
21 lines of code changed in 1 file:
* Added instructions overlay to indicate gestures movements. (WIP)
9 lines of code changed in 1 file:
* Increased gesture touch markers.
* Allowed gestures to take place of button inputs.
14 lines of code changed in 2 files:
* removed timer listeners from musicmanager for user and friends in offline mode.
2 lines of code changed in 1 file:
* Added GestureActionPanel for accepting pseudo gesture inputs via an on-screen overlay.
* Added new version of encounter that accepts input.
* Updated assets containing additional buttons for the actions. (GestureAction________)
* Toggled new version of the encounter to occur for first encounter (Anglerfish).
20 lines of code changed in 2 files:
caught edge cases
6 lines of code changed in 1 file:
tied up some loose ends
406 lines of code changed in 4 files:
updated encounters
14 lines of code changed in 3 files:
new world map.
102 lines of code changed in 4 files:
Morphing tweaks.
9 lines of code changed in 1 file:
login screen callback functioning.
61 lines of code changed in 1 file:
facebook integration complete.
50 lines of code changed in 2 files:
fixed permissions issues.
40 lines of code changed in 2 files:
morphing fixes.
13 lines of code changed in 1 file:
Allowed adding of new artistes
104 lines of code changed in 1 file:
interface tweaks.
48 lines of code changed in 1 file:
facebook music connect image loader.
33 lines of code changed in 1 file:
Facebook connection
75 lines of code changed in 2 files:
query bridge complete.
9 lines of code changed in 1 file:
queued music query
32 lines of code changed in 1 file:
(15 more)