[root]/src/edu/mit/icelab/games/cmsproject/tutorial

| Author | Changes | Lines of Code | Lines per Change |
|---|---|---|---|
| culim | 48 (100.0%) | 2108 (100.0%) | 43.9 |
* Removed stale files and dependencies.
0 lines of code changed in 6 files:
* Renamed project to Mimesis.
12 lines of code changed in 6 files:
* Refactoring encounters narrative structure.
* Re-aligned NPC assets for Anglerfish.
* Narrative dialog switching WIP.
2 lines of code changed in 1 file:
* Second pass includes all dialog up until final internal thought by PC after last-word.
13 lines of code changed in 1 file:
* First pass integration of narrative clause dialogs up to second PC INT and EXT response.
9 lines of code changed in 1 file:
* Added thresholds to gestures.
39 lines of code changed in 1 file:
* Removed old encounters xml reference.
10 lines of code changed in 5 files:
* Added better gesture handling.
* Redone gesture indicators.
35 lines of code changed in 1 file:
* Added instructions overlay to indicate gestures movements. (WIP)
5 lines of code changed in 1 file:
* Increased gesture touch markers.
* Allowed gestures to take place of button inputs.
35 lines of code changed in 1 file:
* Added gesture support for encounters. (basic)
369 lines of code changed in 1 file:
* Added GestureActionPanel for accepting pseudo gesture inputs via an on-screen overlay.
* Added new version of encounter that accepts input.
* Updated assets containing additional buttons for the actions. (GestureAction________)
* Toggled new version of the encounter to occur for first encounter (Anglerfish).
288 lines of code changed in 1 file:
tied up some loose ends
6 lines of code changed in 4 files:
new world map.
30 lines of code changed in 4 files:
adding genre integration to octopus
18 lines of code changed in 2 files:
updates
524 lines of code changed in 4 files:
integrated new npcs
35 lines of code changed in 3 files:
added second track
454 lines of code changed in 3 files:
updates.
3 lines of code changed in 1 file:
scnario entered.
221 lines of code changed in 1 file: