[root]/src/edu/mit/icelab/games/cmsproject/xml/narratives

| Author | Changes | Lines of Code | Lines per Change |
|---|---|---|---|
| culim | 3 (100.0%) | 169 (100.0%) | 56.3 |
* Refactoring encounters narrative structure.
* Re-aligned NPC assets for Anglerfish.
* Narrative dialog switching WIP.
169 lines of code changed in 3 files: