Week of |
Group A |
Group B |
Group C |
Group D |
Lab # |
Lab Topic |
|
Feb. 5 |
- |
- |
- |
- |
- |
- no lab - |
|
Feb. 12 |
TBA |
TBA |
TBA |
TBA |
1 |
Familiarization |
|
Feb. 19 |
- |
- |
- |
- |
- |
- no lab - |
|
Feb. 26 |
TBA |
TBA |
TBA |
TBA |
2 |
Characterization of the Electro-Mechanical Plant |
|
Mar. 5 |
- |
- |
- |
- |
- |
- no lab - |
|
Mar. 12 |
TBA |
TBA |
TBA |
TBA |
3 |
Construction of a Proportional Velocity Controller
|
|
Mar. 19 |
TBA |
TBA |
TBA |
TBA |
4 |
Position Control of an Inertial Plant |
|
Mar. 26 |
- |
- |
- |
- |
- |
- no lab (Spring Break) - |
|
Apr. 2 |
TBA |
TBA |
TBA |
TBA |
5 |
Design Exercise |
|
Apr. 9 |
TBA |
TBA |
TBA |
TBA |
6 |
Frequency Response Measurement |
|
Apr. 16 |
- |
- |
- |
- |
- |
- no lab - |
|
Apr. 23. |
TBA |
TBA |
TBA |
TBA |
7 |
PI Control |
|
Apr. 30. |
TBA |
TBA |
TBA |
TBA |
8 |
PID Position Control |
|
May 7 |
TBA |
TBA |
TBA |
TBA |
9 |
Introduction to System Identification |