Date | Description | Material |
September 22 | Preliminary reverse engineering | Team B: Call
graph generator,
surprises
Team C: CM: RA Startup and Disconnection Team D: What's the CM? Team E: CTAS Surprises Team F: Jeremy Brown's comments |
October 7 | Reverse engineering | Team A: Assignment of aircraft to RA's Slides/ppt,
Slides/ps,
Report
Team B: Messages to/from CM Team C: Interface between CM and RA/DP Team D: Interface between CM and RA/DP Team E: Airspace/Airport Configuration (missing content) Team F: Aircraft tree Team G: Interface between CM and ISM |
Team web sites | Team A
Team B Team C Team D Team E Team F |
Back to the 6.894 home page