6894 Project Notes

Guidelines for project work and reporting:
  • Reverse engineering
  • Design
  • Material from class presentations and discussions:
     
    Date Description Material
    September 22 Preliminary reverse engineering Team B: Call graph generator, surprises
    Team C: CM: RA Startup and Disconnection
    Team D: What's the CM?
    Team E: CTAS Surprises
    Team F: 
    Jeremy Brown's comments
    October 7 Reverse engineering Team A: Assignment of aircraft to RA's Slides/ppt, Slides/ps, Report
    Team B: Messages to/from CM
    Team C: Interface between CM and RA/DP
    Team D: Interface between CM and RA/DP
    Team E: Airspace/Airport Configuration (missing content)
    Team F: Aircraft tree
    Team G: Interface between CM and ISM
    Team web sites Team A
    Team B
    Team C
    Team D
    Team E
    Team F

    Back to the 6.894 home page